Tunnel Mucking Loader
1.Factory-direct pricing with no middlemen, cutting costs while maintaining premium quality.
2.Rigorous field simulation ensures reliability in hard rock/high-humidity tunnels.
3.Automated production + global logistics network for on-time project delivery.
4.Adjustable bucket capacity & hydraulic systems to match your tunnel specs.
5.Free on-site training + 5-year warranty, reducing fuel/maintenance expenses.
Product Details
Tunnel Mucking Loader is a key mechanical equipment used in tunnel construction for loading and removing muck such as rocks, soil and other waste.
Parameters
Item | ZWY-80/30L | ZWY-80/37L | ZWY-80/45L | ZWY-100/45L | ZWY-120/65L | ZWY-150/55L | ZWY-180/75L | ZWY-220/75L | |
Main Technical Parameters | |||||||||
Applicable Section (Width × Height) m | 3.2×2.2 | 3.5×2.5 | 4×2.5 | 4.8×3.2 | 5.4×4.0 | 5.8×4.5 | 6.2×5 | 7.5×5.5 | |
Applicable Axis Width* | (-16° ~ +16°) | (-20° ~ +20°) | ( -32° ~ +32°) | ||||||
Loading Capacity m³/h | 80 | 100 | 120 | 150 | 180 | 220 | |||
Control Mode | Hydraulic Pilot Control | ||||||||
Main Motor Power KW | 30 | 37 | 45 | 55 | 75 | ||||
Digging Width mm | 3200 | 3500 | 4000 | 4600 | 5400 | 5800 | 6200 | 7000 | |
Digging Distance mm | 1500 | 1600 | 1800 | 2150 | 2500 | 3300 | |||
Digging Height mm | 1800 | 2200 | 3000 | 3500 | 3800 | 4000 | 4300 | ||
Digging Depth mm | 400 | 500 | 800 | 990 | 1050 | ||||
Unloading Height (Adjustable) mm | 1200 | 1450 | 2000 | ||||||
Unloading Distance (Adjustable) mm | 1150 | ||||||||
Max. Rotation Angle* | ±36° | ±45° | ±55° | ||||||
Max. Transport Material Size mm | < φ500 | < φ580 | < φ625 | < φ780 | |||||
Boom Structure | Single Boom | Single Boom (or Double Boom) | Double Boom | ||||||
Hoisting Speed m/min | 44 | ||||||||
Track Gauge (Adjustable) mm | 890 | 890 | 900 | 1110 | 1190 | 1400 | |||
Travel Speed m/s | 0.5 | ||||||||
Ground Clearance mm | 300 | ||||||||
Min. Turning Radius m | ≥ 5 | ≥ 7 | ≥ 8 | ||||||
Ground Pressure MPa | ≤ 0.1 | ||||||||
Rated Working Pressure MPa | 23 | ||||||||
Max. Bucket Size | Length mm | 3350 | 4200 | ||||||
Width mm | 850 | 900 | 1000 | 1100 | 1200 | ||||
Height mm | 1200 | 1400 | 1500 | 1650 | |||||
Max. Bucket Weight Kg | 2300 | 3000 | 3500 | ||||||
Max. Overall Dimensions (Working) | Length mm | 6000 | 6500 | 6800 | 7000 | 7500 | 8800 | ||
Width mm | 1750 | 1800 | 2200 | 2350 | 2640 | ||||
Height mm | 1750 | 1750 | 1800 | 2900 | 3250 | 3600 | 3800 | 4200 | |
Machine Weight Kg | 7600 | 8000 | 8200 | 11200 | 13800 | 15200 | 17800 | 20000 | |
Core Functions
●Loading Operation: Quickly collect the muck generated during tunnel excavation and load it into transport vehicles (such as mine cars, dump trucks) or conveying equipment through devices like mechanical arms, buckets or scrapers.
●Muck Removal: Clear the deposits at the tunnel bottom, keep the working surface clean, and provide a safe environment for subsequent construction (such as support and excavation).
Application Scenarios
●Tunnel Excavation: Used in conjunction with tunnel boring machines (such as TBMs, shield machines) or drilling and blasting methods in the construction of subways, railways, highways, and water conservancy tunnels.
●Underground Engineering: Suitable for muck removal in narrow spaces including mine roadways, underground utility tunnels, and national defense projects.
Technical Features
⭐Efficient Continuous Operation: Driven by hydraulic or electric systems, enabling fast loading and transportation to improve construction efficiency.
⭐Adaptable to Complex Terrain: Equipped with crawler or wheeled chassis, ensuring stable operation in soft soil, rock and other geological conditions.
⭐Multi‑function Integration: Some models integrate crushing, mixing and other functions to meet diverse construction needs.
Supporting Equipment
Usually used with dump trucks, belt conveyors or muck separation systems to form a complete muck handling process.
Industrial Value
●The tunnel mucking loader is an indispensable machine in tunnel construction. Its efficient and safe performance directly affects project progress and cost.
●As tunnel projects develop toward longer and deeper scales, higher requirements are placed on mucking loaders, such as automation and environmental protection.